Video Wall and Systems Installation

Temple Baptist Church

Temple Baptist Church in Cullman, AL initially sought to replace their aging projectors with newer, brighter units to overcome light bleed from their stage front-wash. After consultation and weighing out different options, the church opted to go with a direct-view LED display that not only was about 3 times brighter for the same cost, but was also significantly larger, covering the entire wall, reducing the overall energy use, and providing more flexibility for the large church’s many productions and events.

With a new display format and the desire to better connect with their congregation both in-person and at a distance, they called on us to design a highly flexible, software-driven switching and routing solution. The Ross Carbonite’s friendliness, flexibility and powerful routing, keying, and processing abilities, coupled with a 12G router gave them room to grow, provided fresh inspiration for their all-volunteer broadcast video team, and paved the way for their future upgrade to campus-wide 4k video.

  • Spring / Summer 2024
  • Permanent-Installation 4k Video Wall
    • ADJ WMS2 Panels, VX16S System Processor
    • Finished Size: 48’ x 8’
  • Broadcast Switcher and Router Upgrade
    • Ross Carbonite Ultra Switcher, TouchDrive TD2 Controller
    • 
BMD VideoHub 12G 40×40 Zero-Latency 4k Router

Ready to Reach your Mark? Let's Connect.

Tell us a bit about your vision, and we’ll show you what makes Arrow+Jay different—personalized service, innovative solutions, and a commitment to helping you achieve more. Reach out today to start the conversation!

We'd love to chat!

541.441.3348 • Mon – Fri 9:00a-5:00p Central

Contact Us